ADU & Garage Conversions
Full-scope conversions from permit drawings through final inspection, managed under one contractor.
Request an estimate
Tell us what you need
Three fields. It reaches a person here, not a call centre.
ADUs and Garage Conversions That Get Permitted
California's ADU laws have made garage conversions and accessory dwelling units the highest-ROI project available to most single-family property owners in Los Angeles County. Under AB 2221 and SB 9, you can add a legal, rentable unit to your lot with fewer setback restrictions and faster approval timelines than ever before. Atomic Renovations handles the full scope: detailed quotes, expedited architectural drawings, permit submission, and construction from demo through finish. If you're sitting on a detached garage or an underused backyard footprint, the window to act is open right now. Request an estimate and we'll tell you exactly what your property can support.
A garage conversion isn't just a framing job. It requires a zoning review of your parcel, a confirmed utility separation plan, proper insulation to residential code, egress-compliant windows, and finished ceiling heights that meet habitable space requirements. The difference between a conversion that passes final inspection and one that doesn't usually comes down to whether the drawings were done correctly before a single wall went up. We produce project engineering documentation that holds up through plan check, not just looks good on paper. Cost varies significantly based on the existing structure's condition, whether you need a full foundation upgrade, your finish level, and how your jurisdiction handles ADU permitting fees. Every job is different, contact Atomic Renovations for an accurate estimate.
California ADU Law
What AB 2221 and SB 9 Actually Allow Actually Allow
The legal landscape shifted in 2020 and again in 2023. Most homeowners don't know how much it changed in their favor.
Our Process
How We Run an ADU Project From Start to Finish
Most ADU projects fail or stall because the homeowner is managing three separate vendors: an architect, a permit expediter, and a GC who shows up after the permit is already pulled. We don't operate that way.
- 01
Estimate and Site Assessment
We review your parcel, existing structure condition, and target use before we quote anything. A garage with a cracked slab and rotted bottom plates needs a different budget than one with a solid foundation. You get a detailed scope and cost analysis upfront, not a surprise mid-project.
- 02
Drawings, Permits, and Plan Check
We produce the architectural drawings in-house and submit directly to your jurisdiction. Expedited drawing turnaround means you're in plan check faster than the typical six-to-eight-week wait with an outside architect. We respond to plan check corrections ourselves. You're not chasing a separate designer to fix comments.
- 03
Build Through Final Inspection
Once the permit is issued, construction starts under the same contractor who drew the plans. We schedule inspections, manage the punch list, and carry the project through final sign-off. The city inspector signs off on our work. That's the only quality metric that actually protects your investment.
Garage Conversion vs. New ADU Construction New ADU Construction
Common ADU Conversion Mistakes That Fail Inspection
Drawings That Don't Match the Field
Plan check approves the drawings. The inspector approves the field. When those two don't match, you get a failed inspection and a stop-work order. We build from our own drawings, so what's on paper is what gets built.
Ceiling Height Below 7 Feet
California habitable space requires a minimum 7-foot finished ceiling height. Some garages sit at exactly 7 feet of rough height, which means zero room for drywall. We measure this before the drawings are done, not after framing is complete.
No Separate Electrical Service
An ADU needs its own sub-panel and metering path. We don't do electrical work ourselves, but our drawings specify the electrical scope clearly so your licensed electrician has a clean set of plans. Vague drawings create expensive field decisions.
Egress Windows Sized Wrong
Every sleeping room in a California ADU requires a code-compliant egress window: minimum 5.7 square feet of net clear opening. Get this wrong and the bedroom can't be permitted as a bedroom. The window and door scope has to be specified in the drawings, not figured out during framing.
ADU Conversion Questions, Answered Directly
How long does a garage conversion ADU permit take in LA County?
Does converting a garage to an ADU require a new foundation?
Can I rent out an ADU in LA County while living in the main house?
What's the difference between a JADU and a standard ADU for a garage conversion?
Do I need separate utilities for a garage conversion ADU?
What permits are required for a garage-to-ADU conversion?
Start Your ADU or Garage Conversion Project
The best time to convert that garage was before the next rent increase. The second best time is now.