Hours vary Inglewood (424) 385-4384
Atomic Renovations
Bathroom Remodeling, Demo to Finish

Inglewood Local

Bathroom Remodeling, Demo to Finish

Full gut-outs, tub-to-shower conversions, and complete bathroom rebuilds managed under one contractor.

Request an estimate

Tell us what you need

Three fields. It reaches a person here, not a call centre.

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your details with partner companies for marketing purposes.

What Drives a Bathroom Remodel Forward

A bathroom remodel is one of the most disruptive projects a homeowner can take on, and the most expensive part isn't the tile or the fixtures. It's the sequence. A contractor who shows up to install a vanity before the rough work is done, or sets tile before waterproofing is verified, creates problems that surface six months later as cracked grout lines, soft subfloor, or worse. Atomic Renovations handles the full scope, from demolition through final fixture installation, so the sequence is controlled start to finish. Request an estimate and find out what your bathroom actually needs before a single wall comes down.

Bathroom remodeling costs scale hard based on scope, existing conditions, and material selections. A basic refresh of an intact bathroom runs very differently from a full gut-out where you're pulling drywall, replacing the subfloor, and reconfiguring layout. The condition of what's behind the walls, especially in older homes, is the biggest unknown. Mold remediation, failed waterproofing, or outdated framing will add time and cost that no flat-rate estimate can absorb. What drives the number up: large format tile, custom shower enclosures, freestanding tubs, structural reconfiguration. What keeps it controlled: clear scope from day one, detailed quotes before work begins, and a project plan that doesn't change mid-job. Every job is different, contact Atomic Renovations for an accurate estimate.

Full Gut-Out vs. Surface Remodel: Know the Difference

The wrong call here is the one that costs you the most money later.

01

Surface Refresh

Paint, fixtures, vanity replacement, and hardware swaps. Right for structurally sound bathrooms with no water damage history and intact tile surfaces.

02

Partial Remodel

Shower retile, tub surround replacement, or vanity and flooring update. Opens selective areas without full demolition. Works when damage is isolated.

03

Full Gut-Out

Everything comes out. Drywall, subfloor, fixtures, tile, framing if needed. The only option when water damage, mold, or failing waterproofing is present behind the walls.

04

Tub-to-Shower Conversion

Remove the tub, frame a new shower, waterproof the pan, set tile, install enclosure. A popular reconfiguration that changes how the whole room functions.

Our Process

How Atomic Runs a Bathroom Remodel

Three stages, no handoffs, no subcontractor confusion. You talk to one contractor from estimate through the last grout joint.

  1. 01

    Estimate and Scope

    We walk the bathroom, assess the existing conditions, and build a detailed quote that covers every phase. No vague line items. You know what you're approving before demo starts.

  2. 02

    Demo and Rough Work

    We pull the existing material, inspect what's underneath, address any substrate or waterproofing issues, and frame or re-frame as the scope requires. Wood and metal framing and drywall are handled in-house.

  3. 03

    Finish and Fixture Install

    Tile, shower enclosures, vanity, mirrors, hardware. The tile and interior finish work is executed by the same crew that ran the rough phase. No trade handoff, no coordination gap at the end of the job.

Scope of Work

What Atomic Handles in a Bathroom Remodel

  1. 01

    Demolition

    Full gut or selective removal. We protect adjacent surfaces, contain the debris, and haul it off. Demo is the first thing we do and the first place a disorganized crew loses a project.

  2. 02

    Waterproofing

    Membrane application in the shower and around the tub surround before any tile goes down. Skipping this step is how you get a beautiful tile job that fails in 18 months.

  3. 03

    Tile and Finishes

    Layout planning, substrate prep, mortar bed, tile setting, grouting. Large format tile, mosaic, subway, natural stone. The tile installation is handled by the same crew throughout.

  4. 04

    Fixture and Vanity Work

    Placement and installation of vanities, mirrors, shower enclosures, and all hardware. Note: we don't do plumbing rough-in or electrical, and we'll coordinate with your licensed trades on timing.

What Separates a Bathroom Remodel That Holds

  1. Waterproofing Done Before Tile, Not After

    Tile is not waterproof. The membrane underneath it is. Any contractor who sets tile directly to cement board in a wet area without a proper waterproofing layer is handing you a future mold problem.

  2. Subfloor Verified Before Anything Goes Down

    Soft spots, delamination, and rot under the existing floor don't disappear when you cover them. We pull up what needs to come up and confirm the substrate is solid before the floor goes in.

  3. Sequence Controlled by One Contractor

    The reason multi-contractor bathroom projects fail is scheduling: plumber leaves before framing is done, tile crew shows up before waterproofing cures. One contractor controlling the sequence eliminates that gap entirely.

Start here

Connect With Atomic Renovations

Describe your bathroom project and get a clear scope and estimate from a contractor who handles the full job.

(424) 385-4384

Mon: 16:30–23:00 Tue: 16:30–23:00 Wed: 16:30–23:00 Thu: 16:30–23:00 Fri: 16:00–00:00 Sat: 08:00–23:00 Sun: 08:00–23:00

Or send it in writing

Three fields, thirty seconds

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your details with partner companies for marketing purposes.

Related Services Worth Knowing About

01

Kitchen Remodeling

The same full-scope process, applied to the kitchen. Demo, framing, tile, cabinets, countertops, and finishes under one contractor. See the kitchen remodeling page for scope detail.

02

Construction Remodeling

Larger structural renovation projects, multi-room reconfiguration, and full-home remodels. Construction remodeling is the natural next step when a bathroom project reveals bigger structural issues.

03

Expedited Architectural Drawings

If your remodel requires a permit, we can move the drawing and approval process faster than a standard architectural timeline. Expedited drawings reduce the gap between estimate approval and breaking ground.

Get a Straight Estimate on Your Bathroom Remodel

No vague ballparks. A real scope, a real number, and a contractor who handles the whole job.

Frequently asked questions

What is the most expensive part of a bathroom remodel?
Shower work consistently drives the highest cost in bathroom remodels, especially when waterproofing, custom tile, and a new shower pan are involved. Behind that, subfloor replacement and layout reconfiguration add significant cost because they require structural work before any finish material goes down. Material selection also swings the number hard: large format porcelain or natural stone costs substantially more than standard ceramic. Every job is different, contact Atomic Renovations for an accurate estimate.
How long does a full bathroom gut-out and remodel take?
A full gut-out with demo, waterproofing, framing, tile, and fixture install typically runs two to four weeks depending on scope, material lead times, and whether any surprises turn up behind the walls. Surface-level refreshes move faster. Projects requiring permits, like layout reconfigurations, add timeline based on the local approval process. Expedited architectural drawings can compress the permit phase when timing is tight.
Do I need a permit to remodel my bathroom?
Cosmetic work, like retiling, replacing a vanity, or swapping fixtures, typically doesn't require a permit in most California jurisdictions. Moving walls, changing the layout, or altering the structural configuration of the bathroom does. When permits are required, Atomic Renovations handles the process, including drawings. Starting work without a permit on scope that requires one is a problem you'll face when you sell the home.
What should I ask a contractor before hiring them for a bathroom remodel?
Ask who specifically does the work, because some contractors sell the job and subcontract everything. Ask what happens if water damage or subfloor issues are found mid-demo, and how that gets priced before they proceed. Ask whether waterproofing is included in the shower scope or treated as an add-on. Ask how the job site is managed daily. Any contractor who can't answer those directly is a contractor who hasn't run many bathrooms.
How do I know if my bathroom needs a full gut-out or just a refresh?
If there's been any water intrusion, grout failure, or soft spots in the floor or wall near the tub or shower, a surface refresh isn't going to fix it. You're covering a problem, not solving one. Tile that moves when you press it, grout that's blackened or crumbling, or a floor that flexes underfoot are all signs that what's underneath needs attention. Atomic Renovations assesses the existing conditions before scoping the project so you're not guessing.
Does Atomic Renovations handle both tile and framing in a bathroom remodel?
Yes. Both wood and metal framing and tile installation are handled in-house, which is how the sequencing stays controlled. In a bathroom remodel, framing and tile are linked, and having different crews responsible for each creates scheduling gaps where waterproofing gets rushed or skipped. One crew, one timeline, one point of accountability.

Related