Hours vary Inglewood (424) 385-4384
Atomic Renovations
Construction Remodeling

Inglewood Local

Construction Remodeling

One contractor managing every phase, from structural demo through finished space.

Request an estimate

Tell us what you need

Three fields. It reaches a person here, not a call centre.

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your details with partner companies for marketing purposes.

Remodeling That Goes Beyond Cosmetics

Remodeling and renovation aren't the same thing. Renovation restores what's already there. Remodeling changes the structure, layout, or function of a space entirely, and that distinction matters because most contractors aren't equipped to handle both. At Atomic Renovations, we're built for the full scope: expedited architectural drawings, permit coordination, structural work, and finish installation under a single contract. If you're weighing a major remodel and want a contractor who can tell you exactly what it involves before a single wall comes down, request an estimate and we'll break it down.

What separates a successful remodel from an expensive mistake is usually process, not materials. We start every project with a detailed scope review and budget and cost analysis so you know what you're committing to before construction begins. From there, project management runs continuous through completion. Cost on any remodel is driven by the size of the affected area, existing structural conditions, the finish level you're targeting, and whether permits are required. Kitchens and bathrooms carry higher costs per square foot than open living areas because of the complexity involved. Every job is different, contact Atomic Renovations for an accurate estimate.

Full Scope

What a Real Remodel Actually Covers Real Remodel

Most remodels stall because no single contractor owns the whole job.

The biggest problem in construction remodeling isn't bad work. It's fragmented responsibility. One contractor demoes. Another frames. A third finishes. Nobody's coordinating the permit timeline, and the homeowner is making calls between three crews trying to keep the schedule from collapsing. We don't operate that way. Atomic Renovations handles project engineering, framing, structural modifications, drywall, tile and interior finishes, and millwork and cabinetry under one contract. We won't do your HVAC, electrical, or plumbing, and we're upfront about that from the first conversation. Everything else, we own.
Home renovations

Our Process

How We Run a Remodel From Start to Finish

  1. 01

    Estimate and Scope

    We assess the existing conditions, identify what gets demolished, and produce a line-item estimate through our estimating and proposal drafting process. No surprises after demolition starts.

  2. 02

    Drawings and Permits

    We produce expedited architectural drawings and manage permit submissions. Faster drawings mean faster permit approvals, which means your project starts on a real timeline, not a hopeful one.

  3. 03

    Structural Build and Finishes

    Demo, framing, concrete work, drywall, tile, and cabinetry all run under our direct management. We track against the approved scope and flag changes before they become cost overruns.

Services We Handle Under One Contract

01

Demolition and Site Prep

Selective demo or full gut-outs, handled clean and to scope. We clear what the drawings call for and nothing extra.

02

Framing and Structural Work

Load-bearing wall removal, new partition framing, header installation. Structural changes get engineered correctly before framing starts.

03

Concrete and Foundation Work

Slab prep, concrete forms, and poured concrete for additions, ADU conversions, and ground-up builds.

04

Drywall and Interior Finishes

From bare framing to taped, finished, and painted walls. Drywall repair and finish work that holds up to inspection, not just the walk-through.

05

Millwork and Cabinetry

Custom and semi-custom cabinetry installation for kitchens, bathrooms, and built-ins. Measurement, layout, and installation are all in-house.

06

ADU and Garage Conversions

Full remodeling scope for ADU and garage conversion projects under California's SB 9 and AB 2221 frameworks. We handle drawings through finished space.

Cost Drivers

What Pushes a Remodel Budget Up or Down

  1. 01

    Existing Structural Conditions

    Older construction often hides surprises: undersized headers, non-compliant framing, subfloor damage. A thorough pre-demo inspection surfaces these before they become change orders mid-build.

  2. 02

    Scope of Structural Modifications

    Opening a wall between two rooms costs more than refinishing the surfaces around it, and extending the footprint with a room or second-story addition is another step up again. Load-bearing changes require engineering review, and that work gets priced into the estimate from the start.

  3. 03

    Finish Level and Material Selection

    Builder-grade tile and contractor-grade cabinetry run significantly less than custom millwork and large-format porcelain. We scope both options so you can make an informed call before materials are ordered.

  4. 04

    Permit Requirements and Drawing Complexity

    Structural remodels in LA County require permitted drawings. The more complex the scope, the more detailed the drawing set, and drawing complexity directly affects permit timeline. Expedited drawing services reduce that delay.

Why One Contractor Across Every Phase Matters

Coordination gaps between trades are where budgets and timelines collapse.

  1. No Re-Scoping Losses

    When one contractor owns demo and another owns framing, scope changes don't transfer cleanly. We own both, so field conditions discovered during demolition get factored into the build without a second negotiation.

  2. Budget Control Through Construction

    We track costs against the original estimate throughout the build. Clients see where the project stands at every phase, not just at the invoice.

  3. One Point of Contact for Every Question

    Whether the question is about tile layout, permit status, or framing inspection, it comes to us. You don't manage the information flow between trades. We do.

Remodeling Questions, Answered Directly

What is the difference between renovating and remodeling?
Renovation typically means restoring or updating a space without changing its structure or layout. Remodeling changes the structure, reconfigures the floor plan, or alters the function of a space. Removing a wall, converting a garage to living space, or relocating a kitchen layout are remodeling projects. Refinishing cabinets or replacing tile is renovation. The distinction matters because remodeling almost always requires permits and structural drawings, while renovation often does not.
Do all remodeling projects in LA County require permits?
Structural changes, including load-bearing wall removal, additions, and ADU conversions, require permits in LA County without exception. Cosmetic work like cabinet replacement or flooring typically does not. The specific threshold depends on the project scope and the jurisdiction. We identify permit requirements during the scoping phase and handle drawing submissions as part of our process, so you're not navigating the building department independently.
How long does a full construction remodel take?
Timeline depends almost entirely on scope, permit processing speed, and structural complexity. A kitchen gut-out and reconfiguration typically runs six to twelve weeks from permit approval. A whole-home remodel or ADU conversion runs longer, often four to six months. Permit timelines in LA County can add weeks before construction even begins. Expedited architectural drawings reduce that window, which is why we offer that service in-house.
Can Atomic Renovations handle both the drawings and the construction?
Yes. That's the core of how we work. We produce expedited architectural drawings, manage permit submissions, and then build the project under the same contract. Splitting those functions across a separate architect and a separate general contractor is the most common reason remodels run over budget and over schedule. When the contractor who writes the drawings also builds the project, scope translation errors don't happen.
What happens if structural problems are discovered after demolition starts?
Discovery items after demo are real, and any contractor who claims otherwise hasn't done enough of this work. We handle this by conducting a thorough pre-demolition assessment and flagging likely conditions before the first wall comes down. If something genuinely unexpected surfaces, we document it, price it, and get client sign-off before proceeding. No work gets done on a changed scope without written authorization. Every job is different, contact Atomic Renovations for an accurate estimate.
Does Atomic Renovations handle remodeling for investment properties and flips?
Yes. Investment property remodels have tighter timelines and stricter budget ceilings than owner-occupied projects, and we understand that. We produce detailed estimates with line-item breakdowns that work as financial inputs for investor decisions. The same single-contractor model applies: demo, structural work, finishes, and project management all run under one contract, which keeps the schedule predictable.

Get the Full Scope Before You Commit

Most remodels go wrong before construction starts. We fix that at the estimate stage.

Related